{"id":3874,"date":"2019-05-12T15:14:43","date_gmt":"2019-05-12T15:14:43","guid":{"rendered":"https:\/\/laweuro.com\/?p=3874"},"modified":"2019-05-12T15:14:43","modified_gmt":"2019-05-12T15:14:43","slug":"decision-no-555-2014-eu-of-the-european-parliament-and-of-the-council-of-15-may-2014-on-the-participation-of-the-union-in-a-european-metrology-programme-for-innovation-and-research-empir-jointly-und","status":"publish","type":"post","link":"https:\/\/laweuro.com\/?p=3874","title":{"rendered":"Decision No 555\/2014\/EU of the European Parliament and of the Council of 15 May 2014 on the participation of the Union in a European Metrology Programme for Innovation and Research (EMPIR) jointly undertaken by several Member States Text with EEA relevance"},"content":{"rendered":"<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td>\n<p class=\"hd-date\">7.6.2014<\/p>\n<\/td>\n<td>\n<p class=\"hd-lg\">EN<\/p>\n<\/td>\n<td>\n<p class=\"hd-ti\">Official Journal of the European Union<\/p>\n<\/td>\n<td>\n<p class=\"hd-oj\">L 169\/27<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr class=\"separator\" \/>\n<p id=\"d1e40-27-1\" class=\"doc-ti\" style=\"text-align: center;\">DECISION No 555\/2014\/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL<\/p>\n<p class=\"doc-ti\" style=\"text-align: center;\">of 15 May 2014<\/p>\n<p class=\"doc-ti\" style=\"text-align: center;\">on the participation of the Union in a European Metrology Programme for Innovation and Research (EMPIR) jointly undertaken by several Member States<\/p>\n<p class=\"doc-ti\" style=\"text-align: center;\">(Text with EEA relevance)<\/p>\n<p class=\"normal\">THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,<\/p>\n<p class=\"normal\">Having regard to the Treaty on the Functioning of the European Union, and in particular Article 185, and the second paragraph of Article 188, thereof,<\/p>\n<p class=\"normal\">Having regard to the proposal from the European Commission,<\/p>\n<p class=\"normal\">After transmission of the draft legislative act to the national parliaments,<\/p>\n<p class=\"normal\">Having regard to the opinion of the European Economic and Social Committee\u00a0(<span class=\"super\">1<\/span>),<\/p>\n<p class=\"normal\">Acting in accordance with the ordinary legislative procedure\u00a0(<span class=\"super\">2<\/span>),<\/p>\n<p class=\"normal\">Whereas:<\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(1)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">In its Communication of 3 March 2010 entitled \u201cEurope 2020 A strategy for smart, sustainable and inclusive growth\u201d (&#8220;the Europe 2020 strategy&#8221;), the Commission emphasised the need to develop favourable conditions for investment in knowledge and innovation so as to achieve smart, sustainable and inclusive growth in the Union. Both the European Parliament and the Council have endorsed that strategy.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(2)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">Regulation (EU) No\u00a01291\/2013 of the European Parliament and of the Council\u00a0(<span class=\"super\">3<\/span>) established Horizon 2020 \u2013 The Framework Programme for Research and Innovation (2014-2020) (&#8220;Horizon 2020&#8221;). Horizon 2020 aims at achieving a greater impact on research and innovation by contributing to the strengthening of public-public partnerships, including through Union participation in programmes undertaken by several Member States in accordance with Article 185 of the Treaty on the Functioning of the European Union.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(3)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">Public-public partnerships should aim to develop closer synergies, increase coordination and avoid unnecessary duplication with Union, international, national and regional research programmes, and should fully respect the Horizon 2020 general principles, in particular those relating to openness and transparency. Moreover, open access to scientific publications should be ensured.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(4)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">By Decision No\u00a0912\/2009\/EC of the European Parliament and of the Council\u00a0(<span class=\"super\">4<\/span>), the Community decided to make a financial contribution to the European Metrology Research Programme (the &#8220;EMRP&#8221;) matching that of the Participating States but not exceeding EUR\u00a0200\u00a0000\u00a0000, for the duration of the Seventh Framework Programme of the European Community for research, technological development and demonstration activities (2007-2013) established by Decision No\u00a01982\/2006\/EC of the European Parliament and of the Council\u00a0(<span class=\"super\">5<\/span>).<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(5)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">In April 2012, the Commission communicated to the European Parliament and to the Council a report on Interim Evaluation of the European Metrology Research Programme \u2013 EMRP. That interim evaluation had been carried out by an expert panel three years after the beginning of the programme. The overall opinion of the expert panel was that EMRP is a well-managed joint European research programme that has already achieved a relatively high level of scientific, management and financial integration. However, the expert panel noted its limited industrial exploitation, limited opening to excellent science outside the metrology institutes and insufficient capacity building. The expert panel was also of the opinion that a more inclusive European metrology research area could be built by implementing the EMRP.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(6)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">Pursuant to Council Decision 2013\/743\/EU\u00a0(<span class=\"super\">6<\/span>) further support may be provided to EMRP.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(7)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The European Metrology Programme for Innovation and Research (&#8220;EMPIR&#8221;), aligned with the Europe 2020 strategy and its flagship initiatives, in particular \u2018Innovation Union\u2019, \u2018A Digital Agenda for Europe\u2019, \u2018Resource-efficient Europe\u2019 and \u2018An Industrial Policy for the Globalisation Era\u2019, will be a more ambitious and inclusive programme, implemented over a period of ten years (2014-2024) by 28 Participating States. As part of the improvement of the previous programme, EMPIR will include activities on innovation and industrial exploitation, on research for norms, standardisation and regulatory purposes and on capacity building.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(8)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Participating States intend to contribute to implementing EMPIR during the period covered by it, namely 2014-2024. In order to take into account the duration of Horizon 2020, calls for proposals under EMPIR should be launched at the latest by 31 December 2020. In duly justified cases, calls for proposals may be launched by 31 December 2021.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(9)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">EMPIR&#8217;s activities should be in line with the objectives and research and innovation priorities of Horizon 2020 and with the general principles and conditions laid down in Article 26 of Regulation (EU) No\u00a01291\/2013.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(10)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">A ceiling should be established for the Union\u2019s financial participation in EMPIR for the duration of Horizon 2020. Within the limits of that ceiling, the Union contribution should be equal to the contribution of the States participating in EMPIR, in order to achieve a high leverage effect and ensure a stronger integration of Participating States&#8217; programmes.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(11)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">In line with the objectives of Regulation (EU) No\u00a01291\/2013, any Member State and any country associated to Horizon 2020 should be entitled to participate in EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(12)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Union\u2019s financial contribution should be subject to formal commitments from the Participating States to contribute to the implementation of EMPIR and to the fulfilment of those commitments. Participating States\u2019 contributions to EMPIR should include a contribution to administrative costs, subject to a ceiling of 5\u00a0% of the budget of EMPIR. Participating States should commit to increase, if necessary, their contribution to EMPIR by a reserve funding capability of 50\u00a0% of their commitment to ensure that they are able to fund their national entities, National Metrology Institutes (&#8220;NMIs&#8221;) and Designated Institutes (&#8220;DIs&#8221;), participating in the selected projects.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(13)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The joint implementation of EMPIR requires an implementation structure. The Participating States have agreed upon the implementation structure for EMRP, and in 2007 set up EURAMET e.V. (&#8220;EURAMET&#8221;), the European Regional Metrology Organisation and a non-profit association under German law. EURAMET also has tasks and obligations related to the wider European and global harmonisation of metrology. Membership of EURAMET is open to all European NMIs, as members, and to DIs, as associates. Membership of EURAMET is not conditional upon the existence of national metrology research programmes. Given that, according to the Report on Interim Evaluation of EMRP, the governance structure of EURAMET has proved to be efficient and of high quality for the implementation of the EMRP, EURAMET should also be used for the implementation of EMPIR. EURAMET should, therefore, be the recipient of the Union\u2019s financial contribution.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(14)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">In order to achieve the objectives of EMPIR, EURAMET should provide financial support mainly in the form of grants to participants in actions selected at the level of EURAMET. Those actions should be selected following calls for proposals under the responsibility of EURAMET. The ranking list should be binding as regards the selection of proposals and the allocation of funding from the Union\u2019s financial contribution and from the contributions from Participating States for EMPIR projects.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(15)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Union\u2019s financial contribution should be managed in accordance with the principle of sound financial management and with the relevant rules on indirect management laid down in Regulation (EU, Euratom) No\u00a0966\/2012 of the European Parliament and of the Council\u00a0(<span class=\"super\">7<\/span>) and Commission Delegated Regulation (EU) No\u00a01268\/2012\u00a0(<span class=\"super\">8<\/span>).<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(16)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">In order to protect the Union&#8217;s financial interests, the Commission should have the right to reduce, suspend or terminate the Union\u2019s financial contribution if EMPIR is implemented inadequately, partially or late, or if the Participating States do not contribute, or contribute partially or late, to the financing of EMPIR. Those rights should be provided for in the delegation agreement to be concluded between the Union and EURAMET.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(17)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">For the purpose of simplification, administrative burdens should be reduced for all parties. Double audits and disproportionate documentation and reporting should be avoided. When audits are conducted, the specificities of the national programmes should be taken into account, as appropriate.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(18)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">Audits of recipients of Union funds provided in accordance with this Decision should ensure a reduction in the administrative burden, in accordance with Regulation (EU) No\u00a01291\/2013.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(19)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">Participation in indirect actions funded by EMPIR is subject to Regulation (EU) No\u00a01290\/2013 of the European Parliament and of the Council\u00a0(<span class=\"super\">9<\/span>). However, due to specific operating needs of EMPIR, it is necessary to provide for derogations from that Regulation in accordance with Article 1(3) of that Regulation.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(20)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The contribution from Participating States mainly represents institutional funding of the NMIs and DIs participating in the selected projects. The contribution from Participating States should also include a cash contribution to the administrative costs of EMPIR. A proportion of the Union\u2019s contribution should be allocated to entities other than NMIs and DIs participating in the selected projects. The calculation of the Union\u2019s financial contribution for NMIs and DIs participating in EMPIR projects should ensure that the Union\u2019s contribution to EMPIR does not exceed the contribution of the Participating States. Considering that the institutional funding of the NMIs and DIs by Participating States corresponds to the overheads allocated to the EMPIR projects not reimbursed by the Union\u2019s contribution, the flat rate for the financing of the eligible indirect costs of the NMIs and DIs should be adapted, compared to the flat rate laid down in Regulation (EU) No\u00a01290\/2013. The flat rate for the financing of the eligible indirect costs of the NMIs and DIs should be determined on the basis of the full indirect costs declared as eligible by NMIs and DIs participating in EMRP projects, which are stable and constitute a reliable approximation of the indirect costs to be incurred by NMIs and DIs participating in EMPIR projects. Since those indirect costs amount to 140\u00a0% of the total direct eligible costs of the NMIs and DIs, excluding direct eligible costs for subcontracting and in-kind contributions free of charge not used on the premises of the beneficiaries, the flat rate for the financing of indirect costs of the NMIs and DIs should be lowered from 25\u00a0%, as laid down in Regulation (EU) No\u00a01290\/2013, to 5\u00a0%. It is therefore appropriate to provide for a derogation from Article 29 of that Regulation for the NMIs and DIs. Other entities participating in EMPIR projects should be funded in accordance with that Regulation.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(21)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">Calls for proposals by EMPIR should also be published on the single portal for participants as well as through other Horizon 2020 electronic means of dissemination managed by the Commission.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(22)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The appropriateness of the funding model with regard to the matching principle between Union and non-Union funds should be re-assessed at the time of the interim evaluation of EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(23)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Union\u2019s financial interests should be protected by means of proportionate measures throughout the expenditure cycle, including the prevention, detection and investigation of irregularities, the recovery of funds lost, wrongly paid or incorrectly used and, where appropriate, administrative and financial penalties in accordance with Regulation (EU, Euratom) No\u00a0966\/2012.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(24)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Commission should conduct an interim evaluation assessing in particular the quality and efficiency of EMPIR, the progress made towards the objectives set and a final evaluation, and should prepare a report on those evaluations.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(25)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">Upon request from the Commission, EURAMET and the Participating States should submit any information the Commission needs to include in the reports on the evaluation of EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(26)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The objective of this Decision is the Union&#8217;s participation in EMPIR, namely to support the provision of appropriate, integrated and fit-for-purpose metrology solutions and the creation of an integrated European Metrology Research system with critical mass and active engagement at regional, national, European and international level that cannot be sufficiently achieved by the Member States alone. The scale and complexity of metrology requirements calls for investments that go beyond the core research budgets of the NMIs and their DIs. The excellence required for research and the development of cutting-edge metrology solutions is spread across national borders and hence cannot be brought together at national level only. Since the objective can therefore be better achieved at Union level by integrating national efforts into a consistent European approach, by bringing together compartmentalised national research programmes, by helping design common research and funding strategies across national borders, and by achieving the critical mass of actors and investments required, the Union may adopt measures, in accordance with the principle of subsidiarity as set out in Article 5 of the Treaty on European Union. In accordance with the principle of proportionality, as set out in that Article, this Decision does not go beyond what is necessary in order to achieve that objective,<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"normal\">HAVE ADOPTED THIS DECISION:<\/p>\n<p id=\"d1e354-27-1\" class=\"ti-art\">Article 1<\/p>\n<p class=\"sti-art\">Participation in the European Metrology Programme for Innovation and Research<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0The Union shall participate in the European Metrology Programme for Innovation and Research (&#8220;EMPIR&#8221;) jointly undertaken by Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Croatia, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Norway, Spain, the Netherlands, Poland, Portugal, Romania, Serbia, Slovenia, Slovakia, Sweden, Switzerland, Turkey and the United Kingdom (the &#8220;Participating States&#8221;), in accordance with the conditions laid down in this Decision.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0Any Member State other than those listed in paragraph 1 and any other country associated to Horizon 2020 may participate in EMPIR, provided it fulfils the condition laid down in point (c) of Article 3(1) of this Decision. If it fulfils the condition laid down in point (c) of Article 3(1), it shall be regarded as a Participating State for the purposes of this Decision.<\/p>\n<p id=\"d1e369-27-1\" class=\"ti-art\">Article 2<\/p>\n<p class=\"sti-art\">Union\u2019s financial contribution<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0The Union\u2019s financial contribution, including EFTA appropriations, to EMPIR shall be up to EUR\u00a0300\u00a0000\u00a0000. The Union&#8217;s financial contribution shall be paid from appropriations in the general budget of the Union allocated to the relevant parts of the Specific Programme, implementing Horizon 2020, established by Decision 2013\/743\/EU, in accordance with point (c)(vi) of Article 58(1) and Articles 60 and 61 of Regulation (EU, Euratom) No\u00a0966\/2012, and in particular from Part II \u201cIndustrial leadership\u201d and Part III \u201cSocietal challenges\u201d.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0Without exceeding the amount laid down in paragraph 1, the Union\u2019s financial contribution shall be equal to the contributions of the Participating States to EMPIR, excluding the contributions of the Participating States to administrative costs exceeding 5\u00a0% of the EMPIR budget.<\/p>\n<p class=\"normal\">3.\u00a0\u00a0\u00a0The Union&#8217;s financial contribution shall not be used to cover the administrative costs of EMPIR.<\/p>\n<p id=\"d1e400-27-1\" class=\"ti-art\">Article 3<\/p>\n<p class=\"sti-art\">Conditions for the Union\u2019s financial contribution<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0The Union\u2019s financial contribution shall be conditional upon the following:<\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(a)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the demonstration by the Participating States that EMPIR is set up in accordance with Annexes I and II;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(b)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the designation by the Participating States, or NMIs designated by Participating States, of EURAMET e.V. (&#8220;EURAMET&#8221;) as the structure responsible for implementing EMPIR and for receiving, allocating and monitoring the Union\u2019s financial contribution;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(c)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the commitment by each Participating State to contribute to the financing of EMPIR and to establish a reserve funding capability of 50\u00a0% of the amount of the commitment;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(d)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the demonstration by EURAMET of its capacity to implement EMPIR, including receiving, allocating and monitoring the Union\u2019s financial contribution in the framework of indirect management of the Union budget in accordance with Articles 58, 60 and 61 of Regulation (EU, Euratom) No\u00a0966\/2012; and<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(e)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the establishment of a governance model for EMPIR in accordance with Annex III.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0During the implementation of EMPIR, the Union&#8217;s financial contribution shall also be conditional upon the following:<\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(a)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the implementation by EURAMET of EMPIR&#8217;s objectives set out in Annex I and activities set out in Annex II, in accordance with the rules for participation and dissemination referred to in Article 5;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(b)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the maintenance of an appropriate and efficient governance model in accordance with Annex III;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(c)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the compliance by EURAMET with the reporting requirements set out in Article 60(5) of Regulation (EU, Euratom) No\u00a0966\/2012; and<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(d)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the fulfilment of the commitments referred to in point (c) of paragraph 1 of this Article.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p id=\"d1e473-27-1\" class=\"ti-art\">Article 4<\/p>\n<p class=\"sti-art\">Contributions from Participating States<\/p>\n<p class=\"normal\">Contributions from the Participating States shall consist of the following:<\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(a)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">contributions through institutional funding of the NMIs and the DIs participating in EMPIR projects;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(b)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">financial contributions to the administrative costs of EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p id=\"d1e494-27-1\" class=\"ti-art\">Article 5<\/p>\n<p class=\"sti-art\">Rules for participation and dissemination<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0For the purposes of Regulation (EU) No\u00a01290\/2013, EURAMET shall be considered to be a funding body and shall provide financial support to indirect actions in accordance with Annex II to this Decision.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0By way of derogation from Article 29(1) of Regulation (EU) No\u00a01290\/2013, indirect eligible costs of NMIs and DIs participating in projects funded by EMPIR shall be determined by applying a flat rate of 5\u00a0% of their total direct eligible costs, excluding direct eligible costs for subcontracting and the costs of resources made available by third parties which are not used on the premises of the beneficiary, as well as financial support to third parties.<\/p>\n<p class=\"normal\">3.\u00a0\u00a0\u00a0The interim evaluation of EMPIR referred to in Article 12 shall include an assessment of the full indirect costs of the NMIs and the DIs participating in EMPIR projects and of the corresponding institutional funding.<\/p>\n<p class=\"normal\">4.\u00a0\u00a0\u00a0On the basis of this assessment and for the purpose of Article 2(2), EURAMET may adapt the flat rate set out in paragraph 2 of this Article.<\/p>\n<p class=\"normal\">5.\u00a0\u00a0\u00a0If insufficient, EURAMET may, by way of derogation from Article 28(3) of Regulation (EU) No\u00a01290\/2013, apply a lower reimbursement rate to the eligible costs of the NMIs and the DIs participating in projects funded by EMPIR.<\/p>\n<p id=\"d1e524-27-1\" class=\"ti-art\">Article 6<\/p>\n<p class=\"sti-art\">Implementation of EMPIR<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0EMPIR shall be implemented on the basis of annual work plans.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0EURAMET shall provide financial support mainly in the form of grants to participants following calls for proposals.<\/p>\n<p class=\"normal\">Before identifying the topics of each call for proposals, EURAMET shall invite interested individuals or organisations from the metrology research community and users to suggest potential research topics.<\/p>\n<p id=\"d1e541-27-1\" class=\"ti-art\">Article 7<\/p>\n<p class=\"sti-art\">Agreements between the Union and EURAMET<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0Subject to a positive ex-ante assessment of EURAMET in accordance with Article 61(1) of Regulation (EU, Euratom) No\u00a0966\/2012, the Commission, on behalf of the Union, shall conclude a delegation agreement and annual transfer of funds agreements with EURAMET.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0The delegation agreement referred to in paragraph 1 shall be concluded in accordance with Article 58(3) and Articles 60 and 61 of Regulation (EU, Euratom) No\u00a0966\/2012 and with Article 40 of Delegated Regulation (EU) No\u00a01268\/2012. It shall also set out the following:<\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(a)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the requirements for EURAMET\u2019s contribution regarding the performance indicators set out in Annex II to Decision 2013\/743\/EU;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(b)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the requirements for EURAMET\u2019s contribution to the monitoring referred to in Annex III to Decision 2013\/743\/EU;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(c)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the specific performance indicators related to the functioning of EURAMET;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(d)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the requirements for EURAMET regarding the provision of information on administrative costs and on detailed figures concerning the implementation of EMPIR;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(e)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">the arrangements regarding the provision of data necessary to ensure that the Commission is able to meet its dissemination and reporting obligations;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(f)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">provisions for the publication of calls for proposals by EMPIR, in particular on the single portal for participants as well as through other Horizon 2020 electronic means of dissemination managed by the Commission.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p id=\"d1e594-27-1\" class=\"ti-art\">Article 8<\/p>\n<p class=\"sti-art\">Termination, reduction or suspension of the Union\u2019s financial contribution<\/p>\n<p class=\"normal\">If EMPIR is not implemented or is implemented inadequately, partially or late, the Commission may terminate, proportionately reduce or suspend the Union\u2019s financial contribution in line with the actual implementation of EMPIR.<\/p>\n<p class=\"normal\">If the Participating States do not contribute, contribute partially or late to the financing of EMPIR, the Commission may terminate, proportionately reduce or suspend the Union\u2019s financial contribution, taking into account the amount of funding allocated by the Participating States to implement EMPIR.<\/p>\n<p id=\"d1e603-27-1\" class=\"ti-art\">Article 9<\/p>\n<p class=\"sti-art\">Ex-post audits<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0Ex-post audits of expenditure on indirect actions shall be carried out by EURAMET in accordance with Article 29 of Regulation (EU) No\u00a01291\/2013.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0The Commission may decide to carry out itself the audits referred to in paragraph 1. In such cases, it shall do so in accordance with the applicable rules, in particular the provisions of Regulations (EU, Euratom) No\u00a0966\/2012, (EU) No\u00a01290\/2013 and (EU) No\u00a01291\/2013.<\/p>\n<p id=\"d1e618-27-1\" class=\"ti-art\">Article 10<\/p>\n<p class=\"sti-art\">Protection of the financial interests of the Union<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0The Commission shall take appropriate measures ensuring that, when actions financed under this Decision are implemented, the financial interests of the Union are protected by the application of preventive measures against fraud, corruption and any other illegal activities, by effective checks and, if irregularities are detected, by the recovery of the amounts wrongly paid and, where appropriate, by effective, proportionate and dissuasive administrative and financial penalties.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0EURAMET shall grant Commission staff and other persons authorised by it, as well as the Court of Auditors, access to its sites and premises and to all the information, including information in electronic format, needed in order to conduct their audits.<\/p>\n<p class=\"normal\">3.\u00a0\u00a0\u00a0The European Anti-Fraud Office (OLAF) may carry out investigations, including on-the-spot checks and inspections, in accordance with the provisions and procedures laid down in Council Regulation (Euratom, EC) No\u00a02185\/96\u00a0(<span class=\"super\">10<\/span>) and Regulation (EU, Euratom) No\u00a0883\/2013 of the European Parliament and of the Council\u00a0(<span class=\"super\">11<\/span>) and, with a view to establishing whether there has been fraud, corruption or any other illegal activity affecting the financial interests of the Union in connection with a grant agreement or grant decision or a contract funded in accordance with this Decision.<\/p>\n<p class=\"normal\">4.\u00a0\u00a0\u00a0Contracts, grant agreements and grant decisions resulting from the implementation of this Decision shall contain provisions expressly empowering the Commission, EURAMET, the Court of Auditors and OLAF to conduct such audits and investigations, in accordance with their respective competences.<\/p>\n<p class=\"normal\">5.\u00a0\u00a0\u00a0In implementing EMPIR, the Participating States shall take the legislative, regulatory, administrative and other measures necessary to protect the Union\u2019s financial interests, in particular, to ensure full recovery of any amounts due to the Union in accordance with Regulation (EU, Euratom) No\u00a0966\/2012 and Delegated Regulation (EU) No\u00a01268\/2012.<\/p>\n<p id=\"d1e668-27-1\" class=\"ti-art\">Article 11<\/p>\n<p class=\"sti-art\">Communication of information<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0At the request of the Commission, EURAMET shall send any information necessary for the preparation of the reports referred to in Article 12.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0The Participating States shall submit to the Commission, through EURAMET, any information requested by the European Parliament, the Council or the Court of Auditors concerning the financial management of EMPIR.<\/p>\n<p class=\"normal\">3.\u00a0\u00a0\u00a0The Commission shall include the information referred to in paragraph 2 of this Article in the reports referred to in Article 12.<\/p>\n<p id=\"d1e689-27-1\" class=\"ti-art\">Article 12<\/p>\n<p class=\"sti-art\">Evaluation<\/p>\n<p class=\"normal\">1.\u00a0\u00a0\u00a0By 30 June 2017, the Commission shall carry out, with the assistance of independent experts, an interim evaluation of EMPIR. The Commission shall prepare a report on that evaluation which includes the conclusions of the evaluation and observations by the Commission. The Commission shall send that report to the European Parliament and to the Council by 31 December 2017. The result of the interim evaluation of EMPIR shall be taken into account in the interim evaluation of Horizon 2020.<\/p>\n<p class=\"normal\">2.\u00a0\u00a0\u00a0At the end of the Union\u2019s participation in EMPIR, but no later than 31 December 2024, the Commission shall conduct a final evaluation of EMPIR. The Commission shall prepare a report on that evaluation which is to include the results of that evaluation. The Commission shall send that report to the European Parliament and to the Council.<\/p>\n<p id=\"d1e713-27-1\" class=\"ti-art\">Article 13<\/p>\n<p class=\"sti-art\">Entry into force<\/p>\n<p class=\"normal\">This Decision shall enter into force on the twentieth day following that of its publication in the <span class=\"italic\">Official Journal of the European Union<\/span>.<\/p>\n<p id=\"d1e723-27-1\" class=\"ti-art\">Article 14<\/p>\n<p class=\"sti-art\">Addressees<\/p>\n<p class=\"normal\">This Decision is addressed to the Member States.<\/p>\n<div class=\"final\">\n<p class=\"normal\">Done at Brussels, 15 May 2014.<\/p>\n<div class=\"signatory\">\n<p class=\"signatory\"><span class=\"italic\">For the European Parliament<\/span><\/p>\n<p class=\"signatory\"><span class=\"italic\">The President<\/span><\/p>\n<p class=\"signatory\">M. SCHULZ<\/p>\n<\/div>\n<div class=\"signatory\">\n<p class=\"signatory\"><span class=\"italic\">For the Council<\/span><\/p>\n<p class=\"signatory\"><span class=\"italic\">The President<\/span><\/p>\n<p class=\"signatory\">D. KOURKOULAS<\/p>\n<\/div>\n<\/div>\n<hr class=\"note\" \/>\n<p class=\"note\">(<span class=\"super\">1<\/span>)\u00a0\u00a0Opinion of 10 December 2013 (not yet published in the Official Journal).<\/p>\n<p class=\"note\">(<span class=\"super\">2<\/span>)\u00a0\u00a0Position of the European Parliament of 15 April 2014 (not yet published in the Official Journal) and decision of the Council of 6 May 2014.<\/p>\n<p class=\"note\">(<span class=\"super\">3<\/span>)\u00a0\u00a0Regulation (EU) No\u00a01291\/2013 of the European Parliament and of the Council of 11 December 2013 establishing Horizon 2020 \u2013 the Framework Programme for Research and Innovation (2014-2020) and repealing Decision No\u00a01982\/2006\/EC (OJ L 347, 20.12.2013, p. 104).<\/p>\n<p class=\"note\">(<span class=\"super\">4<\/span>)\u00a0\u00a0Decision No\u00a0912\/2009\/EC of the European Parliament and of the Council of 16 September 2009 on the participation by the Community in a European metrology research and development programme undertaken by several Member States(OJ L 257, 30.9.2009, p. 12).<\/p>\n<p class=\"note\">(<span class=\"super\">5<\/span>)\u00a0\u00a0Decision No\u00a01982\/2006\/EC of the European Parliament and of the Council of 18 December 2006 concerning the Seventh Framework Programme of the European Community for research, technological development and demonstration activities (2007-2013) (OJ L 412, 30.12.2006, p. 1).<\/p>\n<p class=\"note\">(<span class=\"super\">6<\/span>)\u00a0\u00a0Council Decision 2013\/743\/EU of 3 December 2013 establishing the specific programme implementing Horizon 2020 \u2013 the Framework Programme for Research and Innovation (2014-2020) and repealing Decisions 2006\/971\/EC, 2006\/972\/EC, 2006\/973\/EC, 2006\/974\/EC and 2006\/975\/EC (OJ L 347, 20.12.2013, p. 965).<\/p>\n<p class=\"note\">(<span class=\"super\">7<\/span>)\u00a0\u00a0Regulation (EU, Euratom) No\u00a0966\/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No\u00a01605\/2002 (OJ L 298 of 26.10.2012, p.1).<\/p>\n<p class=\"note\">(<span class=\"super\">8<\/span>)\u00a0\u00a0Commission Delegated Regulation (EU) No\u00a01268\/2012 of 29 October 2012 on the rules of application of Regulation (EU, Euratom) No\u00a0966\/2012 (OJ L 362 of 31.12.2012, p. 1).<\/p>\n<p class=\"note\">(<span class=\"super\">9<\/span>)\u00a0\u00a0Regulation (EU) No\u00a01290\/2013 of the European Parliament and of the Council of 11 December 2013 laying down the rules for participation and dissemination in &#8220;Horizon 2020 &#8211; the Framework Programme for Research and Innovation (2014-2020)&#8221; and repealing Regulation (EC) No\u00a01906\/2006 (OJ L 347, 20.12.2013, p. 81).<\/p>\n<p class=\"note\">(<span class=\"super\">10<\/span>)\u00a0\u00a0Council Regulation (Euratom, EC) No\u00a02185\/96 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities&#8217; financial interests against fraud and other irregularities (OJ L 292, 15.11.1996, p. 2).<\/p>\n<p class=\"note\">(<span class=\"super\">11<\/span>)\u00a0\u00a0Regulation (EU, Euratom) No\u00a0883\/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC) No\u00a01073\/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No\u00a01074\/1999 (OJ L 248, 18.9.2013, p. 1).<\/p>\n<hr class=\"doc-sep\" \/>\n<div id=\"L_2014169EN.01003501\">\n<p id=\"d1e32-35-1\" class=\"doc-ti\">ANNEX I<\/p>\n<p id=\"d1e38-35-1\" class=\"ti-grseq-1\"><span class=\"bold\">OBJECTIVES OF EMPIR<\/span><\/p>\n<p class=\"normal\">EMPIR shall pursue the following general objectives:<\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(a)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">provide appropriate, integrated and fit-for-purpose metrology solutions supporting innovation and industrial competitiveness, as well as measurement technologies addressing societal challenges such as health, environment and energy, including support to policy development and implementation;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">(b)<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">create an integrated European Metrology Research system with critical mass and active engagement at regional, national, European and international level.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<hr class=\"doc-sep\" \/>\n<div id=\"L_2014169EN.01003601\">\n<p id=\"d1e32-36-1\" class=\"doc-ti\">ANNEX II<\/p>\n<p id=\"d1e38-36-1\" class=\"ti-grseq-1\"><span class=\"bold\">INDIRECT ACTIONS SUPPORTED BY EMPIR<\/span><\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">1.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">EMPIR may support the following indirect actions in the area of joint research and technological development:<\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">1.1.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">scientific-technical actions supporting fundamental scientific metrology laying the basis for all successive steps including applied metrology research and development and metrology-related services;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">1.2.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">metrology research to provide solutions for societal challenges focusing on contributions to energy, environment and health;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">1.3.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">research in order to develop novel measurement instrumentation aiming at industrial take-up of metrological technologies to stimulate innovation in industry;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">1.4.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">pre-normative and co-normative metrology research and development for priority documentary standards aiming to use the expertise of metrology institutes of the Participating States to support policy implementation and accelerate innovative products and services to market;<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"96%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\">\n<p class=\"normal\">1.5.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">metrology capacity-building activities on different technological levels aiming to achieve a balanced and integrated metrology system in the Participating States, and enabling them to develop their scientific and technical capabilities in metrology.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">2.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">EMPIR may support further actions for the dissemination and exploitation of results of metrology research.<\/p>\n<p class=\"normal\">EMPIR may support other actions specifically addressing metrology institutes which have no or limited scientific capabilities, by supporting them in using other European Union, national or regional programmes for training and mobility, cross-border cooperation or investment in metrology infrastructure.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">3.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">EMPIR may support organisation of networking activities to promote EMPIR and maximise its impact.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">4.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The indirect actions referred to in point 1 shall be carried out by NMIs and DIs according to the designation by the appropriate national authority. However, EMPIR shall encourage and support the participation of other entities in all calls launched by EMPIR. This approach is expected to result in around 15\u00a0% of the budget of EMPIR going to those entities.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<hr class=\"doc-sep\" \/>\n<div id=\"L_2014169EN.01003701\">\n<p id=\"d1e32-37-1\" class=\"doc-ti\">ANNEX III<\/p>\n<p id=\"d1e38-37-1\" class=\"ti-grseq-1\"><span class=\"bold\">IMPLEMENTATION AND GOVERNANCE OF EMPIR<\/span><\/p>\n<p id=\"d1e44-37-1\" class=\"ti-grseq-1\">I\u00a0\u00a0\u00a0<span class=\"bold\">Role of EURAMET<\/span><\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">1.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">EURAMET shall be responsible for implementing EMPIR, subject to Article 3. It shall manage the Union\u2019s financial contribution to EMPIR and shall be responsible for preparing and implementing the annual work plan, the organisations of calls for proposals, the handling of proposal evaluation and ranking and any other activities resulting from the annual work plan. EURAMET shall be responsible for grant management including signature of grant agreements, the receipt, allocation and monitoring of the use of the Union\u2019s financial contribution and payments to EMPIR participants in the selected projects.<\/p>\n<p class=\"normal\">The monitoring of the Union\u2019s financial contribution shall cover all the activities of control and audit, ex-ante and\/or ex-post control, necessary to carry out the tasks delegated to EURAMET by the Commission. Those activities shall aim to provide reasonable assurance as to the legality and regularity of the underlying transactions and the eligibility of the costs declared under grant agreements.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">2.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">EURAMET may entrust to the Participating States certain administrative and logistical tasks in implementing EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p id=\"d1e65-37-1\" class=\"ti-grseq-1\">II\u00a0\u00a0\u00a0<span class=\"bold\">The organisational structure of EURAMET involved in implementing EMPIR<\/span><\/p>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">1.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The General Assembly is the highest authority with respect to all EURAMET matters. The EMPIR Committee manages the programme within a framework defined by EURAMET, so that EURAMET can ensure that the programme as executed meets its objectives.<\/p>\n<p class=\"normal\">The EMPIR Committee shall be composed of representatives of EURAMET members from the Participating States. The voting weights shall be calculated from the national commitments according to a square root rule.<\/p>\n<p class=\"normal\">The EMPIR Committee shall take, in particular, decisions on the strategic research and innovation agenda, the planning of calls for proposals, the evaluation review procedure, the selection of the projects to be funded according to the ranking lists and the monitoring of progress of the funded projects. It shall adopt the annual work plan after obtaining approval from the Commission.<\/p>\n<p class=\"normal\">The Commission shall have observer status in the meetings of the EMPIR Committee. However, the adoption of the annual work plan by the EMPIR Committee shall require the prior consent of the Commission. The EMPIR Committee shall invite the Commission to its meetings and shall send the Commission the relevant documents. The Commission may take part in the discussions of the EMPIR Committee.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">2.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Chairperson of the EMPIR Committee and his or her deputy shall be elected by the EMPIR Committee. The Chairperson of the EMPIR Committee shall be one of the two Vice-chairpersons of EURAMET. The Chairperson of the EMPIR Committee shall represent EURAMET in matters related to EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">3.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Research Council shall be composed of high-level experts from industry, research, academia and international stakeholder organisations. It shall provide independent strategic advice on the annual work plan of EMPIR. The members of the Research Council shall be appointed by the EURAMET General Assembly.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">4.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Secretariat of EURAMET providing general administrative support for EURAMET shall keep the bank accounts for EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"4%\" \/>\n<col width=\"4%\" \/>\n<col width=\"92%\" \/> <\/colgroup>\n<tbody>\n<tr>\n<td valign=\"top\"><\/td>\n<td valign=\"top\">\n<p class=\"normal\">5.<\/p>\n<\/td>\n<td valign=\"top\">\n<p class=\"normal\">The Management support unit shall be established as part of the Secretariat of EURAMET and shall be responsible for the implementation and the day-to-day management of EMPIR.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"social-share-buttons\"><a href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https:\/\/laweuro.com\/?p=3874\" target=\"_blank\" rel=\"noopener\">Facebook<\/a><a href=\"https:\/\/twitter.com\/intent\/tweet?url=https:\/\/laweuro.com\/?p=3874&text=Decision+No+555%2F2014%2FEU+of+the+European+Parliament+and+of+the+Council+of+15+May+2014+on+the+participation+of+the+Union+in+a+European+Metrology+Programme+for+Innovation+and+Research+%28EMPIR%29+jointly+undertaken+by+several+Member+States+Text+with+EEA+relevance\" target=\"_blank\" rel=\"noopener\">Twitter<\/a><a href=\"https:\/\/www.linkedin.com\/shareArticle?url=https:\/\/laweuro.com\/?p=3874&title=Decision+No+555%2F2014%2FEU+of+the+European+Parliament+and+of+the+Council+of+15+May+2014+on+the+participation+of+the+Union+in+a+European+Metrology+Programme+for+Innovation+and+Research+%28EMPIR%29+jointly+undertaken+by+several+Member+States+Text+with+EEA+relevance\" target=\"_blank\" rel=\"noopener\">LinkedIn<\/a><a href=\"https:\/\/pinterest.com\/pin\/create\/button\/?url=https:\/\/laweuro.com\/?p=3874&description=Decision+No+555%2F2014%2FEU+of+the+European+Parliament+and+of+the+Council+of+15+May+2014+on+the+participation+of+the+Union+in+a+European+Metrology+Programme+for+Innovation+and+Research+%28EMPIR%29+jointly+undertaken+by+several+Member+States+Text+with+EEA+relevance\" target=\"_blank\" rel=\"noopener\">Pinterest<\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>7.6.2014 EN Official Journal of the European Union L 169\/27 DECISION No 555\/2014\/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 15 May 2014 on the participation of the Union in a European Metrology Programme for Innovation and Research&hellip;<\/p>\n<p class=\"more-link-p\"><a class=\"more-link\" href=\"https:\/\/laweuro.com\/?p=3874\">Read more &rarr;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-3874","post","type-post","status-publish","format-standard","hentry","category-eu-law"],"_links":{"self":[{"href":"https:\/\/laweuro.com\/index.php?rest_route=\/wp\/v2\/posts\/3874","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/laweuro.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/laweuro.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/laweuro.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/laweuro.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3874"}],"version-history":[{"count":1,"href":"https:\/\/laweuro.com\/index.php?rest_route=\/wp\/v2\/posts\/3874\/revisions"}],"predecessor-version":[{"id":3875,"href":"https:\/\/laweuro.com\/index.php?rest_route=\/wp\/v2\/posts\/3874\/revisions\/3875"}],"wp:attachment":[{"href":"https:\/\/laweuro.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/laweuro.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/laweuro.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}